    3. Steel vertical mill process configuration comparison

      08 Nov,2018 UTC+8 Views:


      Main equipment configuration comparison

       

      Steel slag final vertical grinding

      Roller mill+ Ball mill grinding

      Host

      GRM34.31 steel slag vertical mill

      Main motor power: 1800kw

      Powder separator power: 160kw

      G140-80 roller press, power: 2x560kw

      Throughput: 300-400t/h

      Φ3.2x13m ball mill, power: 1600kw

      Auxiliary machine

       

      CCLF-2x13 air box pulse  

      Powder collector 240000m3/h  

      Cycle boost: NE300, 300t/h, 75kw

      V-type separator: 140000-200000m3/h

      Main fan   

      Full pressure 9kPa

      Power 800kw  

      Grinding lift: TGD315, 60t/h, 18.5kw

      High efficiency separator

      120000m3/min-165000m3/min, 110KW

      Hot air stove 8000000 kcal/h

      Hot air stove 8000000 kcal/h

      Process advantage comparison

       

      Steel slag vertical grinding system

      Roller mill+ Ball mill system

      Environmental

      Grinding, drying, powder selection and conveying are integrated.

      There is basically no dust pollution.

      The system runs quietly.

      The external circulation of the system is large.

      There are many lifting and conveying processes.

      Special attention needs to be paid to the dust.

      The system is running quietly.

      Raw material moisture adaptability

      The material bed is ground and can adapt to the high moisture content of the material ≤15%.

       

      Sensitive to moisture, requires material moisture≤6.5%.

      Repair and maintenance

       

      Roller and disc maintenance generally uses online surfacing, which takes 4 to 6 days;

      Vertical mill open layout, easy to replace the roller cover

      Roller surface wear online welding, it takes 8~10 days;

      Roller surface shedding is more common, and it is necessary to remove the roller for offline repair and surfacing, which is difficult to maintain.

       

      The system equipment has few links, the failure rate is extremely low, and the operation rate is greater than 95%.

       

      There are many links in the system equipment, the circulation volume is large, the load on the machine is large, and the risk of failure is large, and the operation rate is about 90%.

       Index comparison

      Item

      Comparison project

      Energy consumption data

      Steel slag vertical grinding mill

      Roller mill+ Ball mill grinding

      1

      Raw material

      Steel slag ≤ 10mm, iron content ≤ 1.5%

      2

      Design yield, fineness

      50t/h、≥430m2/kg

      3

      Actual operating output

      45~55t/h

      40~50t/h

      4

      Total installed power

      3000kw

      3575kw

      5

      Tons of installed power

      3575kw

      79kwh

      6

      Tons of operating power consumption

      ~50kwh

      ~65kwh

       

      Annual electricity saving (0.7 yuan / kwh)

      ~315 million

      0

      7

      Tons of metal consumption

      14g

      50g

      8

      Tons of maintenance costs

      0.38

      4.27

      9

      Ton daily maintenance fee

      0.14

      0.19

       

      Annual maintenance and maintenance costs

      ~105million